


USS Decatur Navy Pursuit Of Peace. This item is in the category “Collectibles\Militaria\Current Militaria (2001-Now)\Original Items\Challenge Coins”. The seller is “joeffel-55″ and is located in this country: US. This item can be shipped to United States.
- Theme: Militaria
- Original/Reproduction: Original
- Featured Refinements: Navy Challenge Coin
